Free calculator · Jobs and installs

Landscaping job bid calculator: price the install, the tear-out, the spring cleanup

You're standing in a backyard with a dead lawn, two dying shrubs and a customer waiting on a number. Mowing you can price in your sleep. This one you can't. There's sod, soil, a dump run, a sod cutter you don't own, and a slope you didn't see from the driveway.

Free. No account, no email, no limit on how many times you run it.

hr
$/ man-hr

Suggested starting point, from our own national service-pricing research. Replace it with your number.

Materials

Item names stay on this device. Share links carry quantities and costs only.

%

Suggested starting point, from our own national service-pricing research. Replace it with your number.

Adjust for this property
$
$
$
%
%

Suggested starting point, from our own national service-pricing research. Replace it with your number.

%

Suggested starting point, from our own national service-pricing research. Replace it with your number.

Suggested bid

$2,020

Labor
$1,728
Materials charged
$0
Extras
$0
Effective labor rate
$84 / man-hr
Actual margin
10.2%
Markup on cost
11.3%

This bid covers your target hourly rate after materials and fees.

Still using our suggested figures for your hourly rate, material markup, profit margin, contingency. Add your own numbers for a sharper answer.

Your result is already on the screen. The email is only so you can keep it.

So you go home, guess, and lie awake wondering if you left $800 on the table or bought a week of free work.

This landscaping job bid calculator does that math in front of you. Materials plus markup, labor at the rate you actually need, rentals, dump and delivery fees, overhead, profit, and a buffer for what the site is hiding. No account, no email, no limits.

What this calculator does

  • Builds a bid for any one-off job: installs, spring cleanups, removals, hardscape, sod, soil and grading
  • Shows materials, labor and profit separately, so you see where the money is
  • Applies a markup to materials and a profit margin to the job, and tells you the difference
  • Adds equipment rental, dump and disposal, and delivery as their own lines
  • Runs an Is this bid healthy? check against your hourly rate

How it works

  1. Enter the labor. Crew size, hours on site, your hourly rate. Three guys for nine hours is 27 man-hours. If you ran the Landscaping Hourly Rate Calculator, that rate carries over.
  2. List the materials. Item, quantity, unit cost. Sod by the square foot, soil by the yard, plants by the each. Then set one markup across the list.
  3. Add the job’s extras. Enter equipment rental, disposal and delivery fees for your sod install, bed renovation, small patio, removal or grading job.
  4. Read the bid. Materials, labor, extras and profit, broken out.

Open Adjust for this property to add equipment rental, dump and delivery fees, set overhead recovery (a percentage, or already baked into your rate), set your profit margin, and add a contingency buffer. Every suggested figure is labeled and editable.

How to calculate a landscaping bid

Materials plus markup, plus man-hours times your hourly rate, plus rentals, dump and delivery. Add overhead if your rate doesn’t carry it, add a contingency buffer, then divide by one minus your profit margin. The calculator rounds the bid up to the next five dollars.

Margin is not markup, and the gap is your money

This is where good bids go bad. Markup is what you add to your cost. Margin is what’s left after cost comes out. Not the same number.

Say a job costs you $4,000. You add 20% markup, bid $4,800, keep $800. But $800 out of $4,800 is a 16.7% margin, not 20%. You marked up 20% and earned 16.7%.

To actually keep 20%, divide instead of multiply: $4,000 ÷ 0.80 = $5,000. Same job, $200 more, and the $200 was yours the whole time. Twelve installs a season is $2,400 handed over because of one arithmetic habit. The calculator shows both numbers on every bid, so you know which one you’re looking at.

A worked example

Darnell runs a three-man crew. Front-yard sod install, 4,200 square feet, old turf out.

LineNumber
Sod, 4,200 sq ft @ $0.42$1,764
Screened topsoil, 6 yd @ $38$228
Starter fertilizer$65
Materials at cost$2,057
Markup, 15%$308.55
Labor, 27 man-hours @ $72$1,944
Sod cutter rental$95
Old turf disposal$140
Delivery$85
Subtotal$4,629.55
Contingency, 5%$231.48
Profit after rounding the bid$543.97
Bid at a 10% target margin, rounded up$5,405

Scroll the table sideways to see every column.

Is this bid healthy?

A number on its own tells you nothing. The check that matters: what’s left after marked-up materials and fees come out, divided by man-hours.

Darnell’s $5,405, minus $2,365.55 of marked-up materials and $320 of rental, dump and delivery, leaves $2,719.45. Across 27 man-hours that’s about $101 a man-hour against a $72 target. Healthy — the gap is his contingency and profit, which is what they’re for.

Then the customer pushes back and he thinks about $4,200 to win it. Check that discount separately: ($4,200 − $2,365.55 − $320) ÷ 27 is about $56 a man-hour, under his own target rate. The job still looks profitable — materials covered, crew paid — but the discount came out of his overhead and his own pay. The calculator checks the bid it calculates; it has no discount-price input, so compare a negotiated price separately before saying yes.

Who this is for

Owners running two to five people who bid one-off work between mowing routes. If you price installs, spring cleanups, removals, hardscape, sod or grading from memory, this is the tool. It works the way you already think about a job.

It is not a homeowner cost guide. This prices work from the contractor’s side of the truck.


Where our suggested numbers come from. We built these tools because “what do I charge?” is the question two-to-five person crews ask each other most. The starting figures behind every input come from our own service-pricing research, reviewed each year and whenever the prices inside Okason change. They are national starting points, not your market. Replace them with your own numbers and the answer gets sharper.

Happy with the bid? Turn this into an estimate is planned for a future release. The intended flow will carry the line items into a draft estimate in Okason for you to review — customer, property, scope, terms, your logo — and send from your phone. Estimate transfer is not available from this calculator yet. Nothing will go out until you send it, and nobody will approve anything from a calculator.

More on pricing one-off work: how to bid a landscaping job step by step, how to calculate landscaping job costs, and landscaping pricing per square foot.

Reviewed Sep 18, 2026 · Written by the Okason team

Frequently asked questions

Most crews run 10% to 25%. It covers sourcing, hauling, staging and eating the damaged pallet. Pass materials through at cost and you work for free on the riskiest part of the job.

Put the number where your crew can reach it

Okason is landscaping software for two-to-five person crews: customers, properties, scheduling, estimates and invoices, run from the phone in your pocket.

  • 14-day trial
  • No credit card
  • No contracts
  • iOS & Android